Thousands of small manufacturers in both the United States and China are very underserved by affordable technology choices.
Beach Access Software, in partnership with Unity World Class Corp., announced the release of the Chinese language version of E-Z-MRP, the integrated Material Requirements Planning system for small and medium-sized manufacturers. The system includes both traditional and simplified Chinese translations, selectable by the user.
According to Rocky Smolin, President of E-Z-MRP, “Everyone who has been in manufacturing for any length of time knows at least one company that was the victim of its own success. They succeeded in the sales department, and failed in manufacturing by losing control of their inventories. Ruinous waste in excess inventories has driven many companies to record sales and record losses because they lost control of this key manufacturing expense.”
Rocky emphasizes that E-Z-MRP, “was designed to be used by people who do not have degrees or certification in manufacturing systems. It requires no on-site training or consultation. And it has cut the standard 18-month MRP implementation cycle to as little as 18 days.”